Luxsky Lighting Co.,Limited

Tel:0086-755-82590839
Contact US
Address: C&H Building, Wanda Industrial Park, Shiyan Town, Bao'an district, Shenzhen City, China
TEL: +86-755-82590839
+86-755-33654459
FAX : +86-755-33654451
Home > Exhibition > Content
October 2017 Dubai International Solar Exhibition
- Jun 28, 2017 -

Basic Information:

Time: 2017/10/23 to 2017/10/25

Venue: Dubai World Trade Center

Sponsored by: Dubai, the Ministry of Water and Power DEWA honorary launch of Dubai Solar Show

Organizer: Hong Kong Exhibition International Group


LED FLOOD LIGHT .jpg


Scope of Exhibits:

Photovoltaic production equipment: silicon rods silicon ingots, silicon wafers, batteries, panels / components, thin film panels, production technology and research equipment

 Photovoltaic cells: photovoltaic cells, battery components, film, battery measuring instruments

PV-related components: batteries, chargers, controllers, converters, cables, connectors, junction boxes, recorders, inverters, monitors, rack systems, tracking systems, installation systems, solar cables, etc.


PV applications: building integrated solutions, standalone systems, solar power plants, solar lighting and toys, energy storage solutions

Photovoltaic engineering and systems: integration of photovoltaic systems, solar air conditioning systems, rural photovoltaic power generation systems, solar energy detection and control systems, solar heating systems engineering, solar photovoltaic engineering process control and engineering management and software development system

Solar thermal power generation system area: trough solar thermal power generation, tower solar thermal power generation, dish solar thermal power generation, solar thermal power generation, etc.


PV ultra-pure water equipment: battery, monocrystalline silicon, silicon material ultra-pure water equipment, monocrystalline silicon / polysilicon production process with ultra-pure water equipment;



October 2017 Dubai International Solar Exhibition

DUBAI SOLAR SHOW

Exhibition time: October 23-17, 2017

Venue: Dubai World Trade Center

China Agent: Hong Kong Exhibition International Group

Exhibition cycle: one year session




Introduction

With the rapid development of the world's new energy industry, the Middle East energy market has also been widespread concern. The Dubai Solar Show, launched by the Middle East Dubai Ministry of Water and Power, will be held concurrently with the Middle East Dubai Water & Hydropower Project. Mainly committed to the field of the latest solar energy projects to provide a unique display platform, but also for the global solar photovoltaic enterprises to develop the Middle East market to build a perfect trading platform! The exhibition will be held at the Dubai International World Trade Center from October 23 to 25, 2017. The exhibition area will exceed 13,000 square meters. Exhibitors from all over the world will come to the scene!

 

ACWA Power, Huawei, Solarcool, Sunpower, Siemens, ABB, Huawei, Almaden, ENOC, Emirates Electrical Engineering LLC (EEE), Jeddah Cable Company, City Care Solar Energy, DF Energy, Jaseera Emirates Power , Empower, GHANTOOT GROUP, Alsa Solar Systems Limited LLC, Enviromena Power Systems, International Power SA, SMA, and the like.

 

Market Information

In recent years, the energy companies in the Middle East have used the local sunshine resources, and actively develop solar energy. According to the latest report of the Middle East Solar Industry Association (MESIA), the Middle East will buy more than 4GW solar power in 2016. By 2017, the PV market in the Middle East and Africa is expected to grow to 9GW.

2016 Middle East and North Africa market is expected, Algeria procurement 2GW, the United Arab Emirates 1150MW (Dubai 800MW, Abu Dhabi 350MW), Egypt 250MW, Morocco 245MW. Jordan (120MW), Kuwait (85MW) and even Saudi Arabia (170MW).

2016 MESIA market outlook is expected in 2016 GCC countries need an additional 1 billion megawatts of electricity demand, there are 155 billion US dollars of solar power equipment investment. 2020 before 20 large-scale energy projects total investment of 300 billion US dollars.


According to the International Renewable Energy Agency (Irena), there are currently 30 renewable energy projects in the program, under construction or completed, is expected to use renewable energy in GCC countries, by 2030 can save 200 billion US dollars.

Dubai's own natural gas storage for its power generation, all dependent on imports; urgent need to develop and use other energy, for its long-term energy reserves to plan. Dubai's electricity demand is growing at an average annual rate of 8%, and with the arrival of the Dubai World Expo in 2020, it will respond to the needs of millions of tourists from around the world.

In 2012, Dubai launched the Maktum solar park plan, is expected to 2030 power generation capacity of 1GW, becoming one of the larger solar energy park, a project in the third quarter of 2013 built, generating capacity of 13MW. According to reports, in 2020, the UAE power consumption will be the current 87 trillion megawatt hours (TWH) doubled to 180 trillion megawatt hours, an average annual growth rate of 8.5%; In view of the next eight years, the United Arab Emirates government power sector investment $ 25 billion to meet the growing demand for electricity. To 2030 will be a total investment of 30 billion dirhams (about 8.17 billion US dollars), built 3000 MW of generating capacity. 2020 and 2030, the proportion of solar power generation in Dubai will reach 7% and 15% respectively.

Dubai Solar Theme Park ($ 8.3 billion), Rooftop Solar - Desert Rose (20 billion dirhams), home solar power access to the national grid, 2020 Dubai World Expo (670 billion investment) ...

 

Introduction to Dubai

First, the goal of the Government of Dubai policy:

Therefore, Dubai proposed the "green economy for sustainable development" goal, in response to the above difficulties, according to the Dubai Water Authority (Dewa) in Dubai 2030 integrated energy strategy based on the release of the latest 2021 Dubai energy strategy to 2030 Dubai 15 % Of electricity from solar energy, clean coal and nuclear power each accounted for 7%. Dubai will continue to actively promote energy diversification.

Second, the Dubai government initiatives and development:


1. Mohammed bin Rashid Al Maktoum Solar Park - $ 3.3 billion Solar Project

The Sun theme park, launched by Dubai Chiefs in September 2011, is part of the Dubai 2030 Energy Development Strategy, with the goal of building a solar power plant with a total generating capacity of 5,000 megawatts. Dubai Ministry of Water and Power (DEWA) specific implementation.


Total investment: 12 billion dirhams (about 3.3 billion US dollars)

Project Information: The Sieh Al Dahl area, located in Dubai's gateway to Al Ai, covers an area of 48 square kilometers and will use photovoltaic and solar technology to generate electricity. Is expected to be completed by 2030.

To 2030 5000 MW of solar power projects

The first stage: October 22, 2013 launched 13MW

The second stage: 200MW will be launched in April 2017

The third stage: 800MW will be phased out by the end of 2020

The next stage: up to 5000MW by 2030

The current progress: Dubai Solar Park Phase III 800 MW project by Abu Dhabi renewable energy company Masdar winning, and in November 29, 2016 formally signed. Prior to this, the Dubai Water Authority told Reuters, China Crystal Energy, the French Electric Power Group (EDF), Saudi Water Company (ACWA Power) are involved in the project bid.


2. Roof Solar Market - 2 billion Dirham Desert Rose Project

The project, which covers an area of 14,000 hectares and 20,000 housing roofs and buildings, will be held by the Daewoo Al Hajiri, director of the development of the Dubai Municipal Council, with a sustainable housing project featuring the roof solar energy. Covering the supply of 200 megawatts of power solar panels, while the residential city will recover more than 40,000 cubic meters of wastewater. Is expected to be completed before the 2010 World Expo.

In order to encourage the development of the private sector roof solar market, the Dubai government is planning to introduce appropriate solar energy tariffs on subsidized policies and regulations that make expensive solar panels profitable. With the construction of the Dubai World Expo in 2020, rooftop solar energy will become part of the UAE's pillar-type energy technology, the relevant market potential is not to be underestimated.


3. Solar energy project for the first time direct access to the Dubai power grid

According to the UAE news agency reported in March 2015, Dubai Airport and DEWA in Dubai World Center to set up a solar array project has been officially access DEWA power grid. The solar array of the project is installed on the roof of the building with an installed capacity of 30 kW and an annual capacity of 48.8 MWh, which meets two thirds of the electricity demand of the building. This is the first direct access to the DEWA grid solar project.


4. Gree in the UAE launched the world's first solar VRF air conditioning

Gree agents NIA Co., Ltd. in the UAE launched the world's first solar VRF air conditioning, the main energy-saving environmental protection concept of revolutionary products, will promote Gree to become the leader of the UAE solar air conditioning market. Integrated power consumption is only one-third of the traditional air-conditioning.

5. Solar lighting equipment in short supply


In recent years, the Middle East countries called for a reduction in energy waste, the UAE canceled petrol subsidies, Dubai, Abu Dhabi, Sharjah is vigorously promoting solar street lighting, there are about 100 km of street lamps converted to solar power.



LED linear lights system .jpg


Main Exhibits

Photovoltaic production equipment: silicon rods silicon ingots, silicon wafers, batteries, panels / components, thin film panels, production technology and research equipment

Photovoltaic cells: photovoltaic cells, battery components, film, battery measuring instruments

PV-related components: batteries, chargers, controllers, converters, cables, connectors, junction boxes, recorders, inverters, monitors, rack systems, tracking systems, installation systems, solar cables, etc.


PV applications: building integrated solutions, standalone systems, solar power plants, solar lighting and toys, energy storage solutions


Photovoltaic engineering and systems: integration of photovoltaic systems, solar air conditioning systems, rural photovoltaic power generation systems, solar energy detection and control systems, solar heating systems engineering, solar photovoltaic engineering process control and engineering management and software development system


Solar thermal power generation system area: trough solar thermal power generation, tower solar thermal power generation, dish solar thermal power generation, solar thermal power generation, etc.


PV ultra-pure water equipment: battery, monocrystalline silicon, silicon material ultra-pure water equipment, monocrystalline silicon / polysilicon production process with ultra-pure water equipment;



Best selling products:

1.2 Meters Continuous Line Lighting System For Supermarket Warehouse 130lm/W LED Continuous Linear Lighting System

1.2m High Brightness Seamless-joint Office Linear Module Lighting Fixtures

1.5M High Lumen and Unique Design Commercial Linear Pendant Lighting System



www.luxsky-light.com